Past 5 Years

Showcasing some completed projects that have enhanced Marine Parade Town over the past five years

7 Divisions in
Marine Parade Town

Divisions

MPTC

7 Divisions in Marine Parade Town

Braddell Heights

MacPherson

Mountbatten

Marine Parade

Geylang Serai

Kembangan-Chai Chee

Joo Chiat


Connectivity & Accessibility

Creating smoother and safer journeys within our Town

Recreational Needs

Fostering active living with spaces for sports, leisure and bonding

Enhancing Our Lives

Improving our estate environment and facilities to enhance our quality of living

Connectivity & Accessibility

1

Construction of High Link between Blks 306 & 307 Serangoon Avenue 2

2

Construction of Linkway over Existing Ramp

  • In front of Blk 319 Serangoon Avenue 2 to Bus Stop
  • Between Blk 416 Serangoon Central and Blk 1 Lorong Liew Lian

3

New Roundabout by LTA at Serangoon Avenue 3

Empty

Empty

Empty

4

Construction of Linkway from Blk 209 Serangoon Central to Bus Stop

5

Construction of Lift by LTA at Overhead Bridge along Upper Serangoon Road & near Blk 1 Lorong Lew Lian

Recreational Needs

1

Upgraded Integrated Family Playground at Blk 235 Serangoon Avenue 3

2

Upgraded Fitness Corner at Blk 208 Serangoon Central

3

Upgraded Playground at Blk 264 Serangoon Central

Empty

Empty

Empty

Empty

Empty

Empty

4

Upgraded Badminton Courts at Blks 236 and 246 Serangoon Avenue

Enhancing Our Lives

1

Home Improvement Programme (HIP) by HDB for Blks 401 to 427 Serangoon Central / Avenue 1

2

Rewiring Works

  • Blks 232A, 234A, 236A and 267 Serangoon Avenue 2/3
  • Blks 255 to 258 Serangoon Central Drive

3

Lift Replacement Programme

  • Blks 255 to 258 Serangoon Central Drive, Lift A & B
  • Blk 264 Serangoon Central, Lift A
  • Blk 267 Serangoon Avenue Avenue 3, Lift A
  • Blks 232A, 234A and 236A Serangoon Avenue 2, Lift A & B

4

Repair and Redecoration Works

  • Blks 232A, 234A and 236A Serangoon Avenue 2
  • Blks 253, 254A and 254 to 258 Serangoon Central Drive
  • Blks 261 to 263, 265 and 266 Serangoon Central Drive
  • Blk 264 Serangoon Central (Braddell Heights Community Hub)
  • Blks 231 to 246 Serangoon Avenue 2/3
  • Blks 301 to 319 Serangoon Avenue 2 and Blks 321 to 329 Serangoon Avenue 2 & 3

Connectivity & Accessibility

1

Improvements to Signalised Junctions by LTA at

  • Jalan Eunos / Bedok Reservoir Road
  • Jalan Eunos / Eunos Crescent Road
  • Sims Avenue
  • Paya Lebar Road / Ubi Avenue 3

2

Construction of Sheltered Linkway from Main Road (Junction) to Blk 416 Eunos Road 5 by LTA

3

Widened Shared and Dedicated Cycling Paths Along Blks 1, 9, and 11 Eunos Crescent by LTA

Empty

Empty

Empty

Empty

Empty

Empty

4

Upgraded High and Low Covered Linkways from Blks 11A to 15 Eunos Crescent and to Blk 19 Eunos Crescent

Recreational Needs

1

Upgraded Playgrounds (Replacement of EDPM flooring)

  • Blk 14 Eunos Crescent
  • Near Blk 32 Eunos Crescent

2

Upgraded Playground and Fitness Corner near Blks 6 and 7 Haig Road

3

Upgraded Fitness Corner at Blk 33 Eunos Crescent

Empty

Empty

Empty

Empty

Empty

Empty

4

Upgraded Street Soccer Court near Blk 11 Eunos Crescent

Enhancing Our Lives

1

Community Plaza with Pavilion between Blks 6 and 7 Haig Road

2

Repair and Redecoration Works

  • Blks 1, 2, 2A, 3, 5 to 25 Eunos Crescent
  • Blks 412 to 413 Eunos Road 5

3

Rejuvenation Works at Geylang Serai Cultural Belt (Iconic Junction)

4

Rewiring Works

  • Blk 1A, 2A, 5 to 8, 13 to 19 and 24 to 25 Eunos Crescent
  • Blks 13 and 14 Haig Road

Connectivity & Accessibility

1

Construction of MRT stations as part of the Thomson-East Coast Line:

  • Siglap station
  • Marine Terrace station

2

Marine Parade Cluster Shuttle Bus (In Service)

Recreational Needs

1

Construction of Dog Runs at Opera and Telok Kurau Estates

2

Construction of Nature Playground at Greenfield Drive Park

3

Construction of Yarrow Park

Empty

Empty

Empty

4

Refurbishing of Elite Terrace Park with Playground and Fitness Facilities

5

Refurbishing of Tanah Puteh Park's Playground and Fitness Facilities

Enhancing Our Lives

1

Rebuild of PCF Sparkletots at 15 Lor K Telok Kurau, a Newly Expanded Pre-school and Childcare Centre

2

Construction of Methodist Welfare Services Senior Care Centre at 1 Chin Cheng Avenue, #01-02

3

Construction of Eunos Polyclinic at 1 Chin Cheng Avenue

6

Distribution of Tingkats, Part of the Green Movement to Reduce Wastage

4

Construction of Kampung Siglap Lifeskills Training & Retreat Centre at 55 Siglap Plain

5

Launch of a New Paediatric Urgent Care Centre at Parkway East Hospital (321 Joo Chiat Place)

Connectivity & Accessibility

1

Construction of Linkway from Blks 21 to 63 Chai Chee Road

2

Construction of Linkway and Drop-off Porch between Blks 808B and 808C Chai Chee Road

3

Silver Zone Gateway Treatment by LTA

  • Reducing speed limits
  • Narrowing roads to lower vehicle speeds
  • Guiding pedestrians to specific crossing points

4

Construction of Linkway from Blks 808A to 808B Chai Chee Road

Recreational Needs

1

Upgraded Fitness Corner at Blk 332 Ubi Avenue 1

2

Upgraded Playground near Blks 10 and 11 Chai Chee Road

3

Construction of Pavilion and BBQ Pits near Blk 42 Chai Chee Street

Enhancing Our Lives

1

Upgraded Senior Citizen Corner at Blk 319 Ubi Avenue 1

2

Rejuvenation Works at Geylang Serai Cultural Belt (Geylang Serai Market)

  • Pick-up/Drop-off Point
  • New Pavilions and Resting Points

3

Repair and Redecoration Works

  • Blks 331 to 352 Ubi Avenue 1
  • Blks 32, 32A, 33 to 34, 35A, 35 to 37 and 40 Chai Chee Avenue
  • Blks 10, 10A and 11 Chai Chee Road
  • Blks 807A to 807C and 808A to 808C Chai Chee Road
  • Blks 2A, 2B, 2C, 2D and 3A Geylang Serai
  • Blks 842, 844, 846, 848 Sims Avenue

4

Construction of Shelter near Stage Area at Blk 35 Chai Chee Avenue

5

Upgraded Residents' Corner at Blk 32, Blk 40 Chai Chee Avenue and Blk 846 Sims Avenue

6

Rewiring Works

  • Blks 33 to 35 Chai Chee Avenue

Connectivity & Accessibility

1

Construction of stations as part of Thomson-East Coast Line

  • Marine Terrace Station
  • Marine Parade Station

2

Construction of Sheltered Linkway from Blk 3 Joo Chiat Road to 38 Changi Road

3

Construction of Covered Linkway from Blk 12 to Blk 50 Marine Terrace

Recreational Needs

1

Upgraded Basketball Court next to Blk 6 Marine Terrace

2

Community Plaza - Upgraded Fitness Corner and Playground between Blks 77, 78 and 79 Marine Drive

3

Upgraded Fitness Corner near Blk 2 Marine Terrace

4

Upgraded Street Soccer Court next to Blk 6 Marine Terrace

Enhancing Our Lives

1

Repairs and Redecoration Works at Blk 50A Marine Terrace Market and Food Centre

2

Upgraded Residents' Corner at Blk 32 Marine Crescent

3

Upgraded Community Plaza with Pavilion at Blk 20 Marine Terrace

5

Rejuvenation Works at Geylang Serai Cultural Belt (Joo Chiat Complex)

  • Entrance Plaza
  • Cyclist Park
  • Open Plaza and Taxi Stand
  • Joo Chiat Walk
  • Pedestrian Street

4

Community Plaza - New Pavilion with Upper Viewing Platform between Blks 77, 78 and 79 Marine Drive

Connectivity & Accessibility

1

Construction of Drop-off Porch at Blk 121 Paya Lebar Way

2

New Extended Corridor from Blk 121 to Blk 122 Paya Lebar Way

3

Construction of Linkway near Blk 120 Geylang East Central

4

Construction of Linkway from Blk 64 to 66 Circuit Road

5

Lifts at Pedestrian Overhead Bridge at Blk 95 Aljunied Crescent

Recreational Needs

1

Upgraded Playground near Blk 57 Circuit Road

2

Upgraded Game Courts near Blk 35 Circuit Road, Blk 20 Balam Road, and Blks 96 and 100 Aljunied Crescent

3

Upgraded Fitness Corner near Blk 31A Balam Road

4

Upgraded Basketball Court and Game Court near Blk 62 Circuit Road

Enhancing Our Lives

1

Rewiring Works

  • Blks 27 to 29 Balam Road
  • Blks 68 and 70 to 72 Circuit Road
  • Blks 55, 56, 92A and 92 Pipit Road
  • Blks 31, 43 to 45, 47 to 52, 57 to 60 and 69 Circuit Road

2

Repair and Redecoration Works

  • Blks 95 to 97, 97A and 98 to 106 Aljunied Crescent
  • Blks 107 to 112 Aljunied Cresent
  • Blks 125 and 126 Aljunied Road
  • Blks 91 and 93 Paya Lebar Way
  • Blks 120 to 123 Geylang East Central
  • Blks 124 to 129 and 130 to 134 Geylang East Avenue 1/2
  • Blks 117 Aljunied Avenue 2
  • Blks 90 and 94 Pipit Road
  • Blks 43 to 52, 57 to 60, 69 and 85 to 88 Circuit Road
  • Blks 17A, 17B, 18A to 18D, 38 to 40, 61 to 67, 77 and 78 Circuit Road

3

Home Improvement Programme (HIP) by HDB at Blks 129 to 134 Geylang East 1/2

Connectivity & Accessibility

1

Construction of stations as part of Thomson-East Coast Line

  • Tanjong Rhu Station
  • Katong Park Station
  • Tanjong Katong Station

2

Upgraded Linkways from Blks 54 to 56A Cassia Crescent

3

Construction of New Lift at Existing Pedestrian Overhead Bridge by LTA along Mountbatten Road near Blk 3 Jalan Batu

Empty

Empty

Empty

Empty

Empty

Empty

4

Construction of Linkway from Blks 97 Jalan Dua to 99 Old Airport Road

Recreational Needs

1

Upgraded Playgrounds near

  • Blk 14 Kampong Arang Road
  • Blk 30 Cassia Crescent

2

Upgraded Fitness Corners near

  • Blk 28 Cassia Crescent
  • Blk 32 Cassia Crescent

3

Upgraded Open Space and Fitness Corner near Blk 43/45 Jalan Tiga

Empty

Empty

Empty

4

Upgraded Hard Court near Blk 14 Kampong Arang Road

Empty

Empty

Empty

Enhancing Our Lives

1

Provision of Residents' Corner at Blk 10 Pine Close

2

Rewiring Works

  • Blk 9 Pine Close
  • Blk 56 Cassia Crescent
  • Blks 93, 93A and 97 Jalan Dua
  • Blks 95 and 99 Old Airport Road
  • Blks 28 and 30 Cassia Crescent

3

Repairs & Redecoration Works

  • Blk 1, 3, 3A, 5, 7 and 11 Pine Close
  • Blks 28, 30 and 56 Cassia Crescent
  • Blk 4A Jalan Batu Market and Food Centre
  • Blk 51 Old Airport Road Food Centre and Shopping Mall

4

Provision of Residents' Corner at Blk 99 Old Airport Road